When we identify a site, we conduct further evaluative testing to determine the type, character, and extent of the site. This is done according to government guidelines, and depends on the type of site, and the type of landform. If the landform allows for it, testing occurs in each cardinal direction or in a grid. Some sites are found on ridges or point terraces, and so in these cases, it is not possible to test in all directions (Figure 1).

Tree Time’s standards are that there must be three negative tests spaced at most 10 m apart in each direction from any positive. Sometimes additional tests are required in order to determine the significance, the size, and type of the site. For example if none of the evaluative tests were positive, further testing might be done at closer intervals to better determine the significance of the site. In addition to rigorous note taking, we also map and photograph the site (Figure 2).

Figure 2. Vince taking notes at a site.

The evaluation of the site is an important step for two main reasons. The first is to enable the government to maintain an accurate site database and to better inform future researchers of the size and type of sites are in the area (Figure 3).

Figure 3. We are evaluating an historic site by flagging artifacts with red flagging tape.

Secondly, in this stage we determine the extent and significance of the site. If a client decides to avoid the site, delineation allows us to more precisely buffer the site. This is important because it allows the development to occur as close to the original plan as possible while still avoiding impacts to the site. In addition, if a client chooses to mitigate their impacts to the site through excavation, a more detailed evaluation of a site allows us to better predict the productivity of the site, and to render cost estimates of any mitigation work more accurately.

Figure 4. Buffer flagged around the site with orange flagging tape.

Once we have surveyed our targets, evaluated any sites we have found, and have finished our notes, it is time to return to the office (Figures 5 and 6).

Figure 5. Reid is finishing his notes before we move onto another target.
Figure 6. After a long cold day, Brittany heads back to the office.

Related Posts

 

By Kurtis Blaikie-Birkigt

April 28, 2020

What Projects Need HRA Approval, or “Clearance”?

As Consulting Archaeologists, most of our work supports “regulatory compliance”.  We help developers get government approval by assessing and mitigating potential impacts to historic resource sites.  I’m frequently asked by developers whether a specific project requires Historical Resource Act Approval (or “Clearance”, as it was known before 2012). This isn’t as easy a question as one

Keep Reading

By Corey Cookson

June 12, 2018

What Makes a Site Significant?

During our field seasons we find 100+ archaeological sites every year; however, not every site we find is flagged for avoidance. The decision of whether a site is avoided or approved for impact ultimately comes down to the Historic Resource Management Branch at Alberta Culture and Tourism’s approval of our recommendations. Our recommendations are based

Keep Reading

By Elenore

March 27, 2018

Publicly Reported Sites

In 2016 two members of the public contacted Tree Time Services to report archaeological sites that they had discovered. Our Archaeological Roadshow was being hosted by the Sundre Museum, during which we were approached by the first person who had found a side-notched projectile point while planting her garden. We arranged to meet her at